Find the right pool
Address and parcel checks keep the measurement tied to your property.
Timeline guide
From guide to measurement
Address and parcel checks keep the measurement tied to your property.
The app traces footprint, perimeter, surface area, and gallons.
Scope and finish choices turn the measured pool into an estimate path.
Field guide
Days 1-5
Equipment is shut down, valves are photographed, the pool drains, and the surface is sounded for hollow spots. Chip-out can run one to three loud days; hydro-jetting changes that rhythm.
Days 5-11
Coping sets the height, tile tucks under it, and the surface follows. Plaster is usually a one-day apply-and-fill. Pebble is applied, then acid-washed the next morning before fill.
Days 11-41
The pool may be swim-ready before day 30, but the care program still runs the month. New cement is curing, and chemistry is protecting the surface while it hardens.
FAQs
Enter your address and we’ll measure your actual pool from satellite imagery — surface area, perimeter, gallons — and price your project the way a premium contractor would. Free, about two minutes, and the measurement is yours either way.
Measure my pool